6
How can we Umbrella Grantees have co-
signed documents for Milestone progress
reports? For example, if we have 27
signatories. One document with all 27
signatures, or 27 separate files?
We (CDII and PCG) are able to work with you if
you need out-of-band, however we are fairly
flexible. For example, if you have 27 separate
signature pages that you combine into one pdf
to upload to the GrantsConnect portal or if you
have to upload 27 different pdfs, we're willing to
Thanks DeeAnne! This is going to be
super important for project management
purposes. Really appreciate it.
are we only signing electronically for the
CDII DXF grant acknowledgement round
3? or is it something we need to attach,
cause i downoaded the form & do not have
The electronic signature is all that is required.
You will prompted to provide one when
selecting 'Submit'.
Thank you Camille. At what point is
something procured? When a vendor is
selected and contract is signed? When a
consultant is hired? When an internal
resource is allocated to the project? thank
you
Thanks for the clarifying question, Tracy! A
signed contract with a vendor or the allocation
of an internal resource of a project would be
sufficient in reaching Milestone 1, as long as the
Grantee has only chosen to meet Outcome 1
("Identifying and Contracting with a Technology
Solution"). If a grantee identified that they would
meet more than one outcome, they would need
to meet all outcomes before they can attest to
I was copied on the notification that was
sent to the IT company that was
coordinating the grant for us but even after
registering an account at the DxF Grant
Portal at https://app.blackbaud.com/, I am
unable to see the grant information. How
can I view the grant information?
An applicant on the existing application must
add your user account. I will outline how this
can be done in the demonstration.